Masterplan WwTW Utrecht

Jump to: navigation, search
Project: Masterplan WwTW Utrecht
Masterplan WwTW Utrecht Project.jpg
Status : running
Companies(s): Brightwork
Technology: Waste water treatment, sludge treatment, digestion, thermal hydrolysis
Locations: Utrecht
Description: Masterplanning WwTW

Brightwork executed several strategic studies to investigate how to redevelop WwTW Utrecht (480,000 PE, 15.000 m3/h design capacity), operated by Waterboard De Stichtse Rijnlanden. The masterplanning covered both the waterline and the sludge treatment and has been approved by the board. The plan’s key results are the planning of a new WwTW and the development of a sludge line at the outskirts of the city of Utrecht.